One-third , seven installation, you can see how important it is to install the floor, but many owners did not agree, tend to ignore the importance of floor installation, leading to all kinds of unnecessary trouble after the floor installation. That multi-layer solid wood flooring installed in what ways, multilayer wood flooring installation should pay attention to the problem? First, the multi-layer solid wood floor pavement before six no shop floor is not dried (wet), the surrounding environment is not clean termite construction site cross-mixing low quality jobs, pollution, humidity, perishable materials for the keel construction period is too short to implement step user requirements absolutely smooth, no color
Second, the multi-layer wood floor coverings during the whole test shop: the deployment of floor color. The tone pattern can be close to the floor in the living room, hallway or a prominent place, the slightly different placed under furniture or around the corner, in order to coordinate the overall appearance. When flooring, reserve between the floor and wall joints 8-12mm above, according to local circumstances leave the floor between the floor and the corresponding expansion joints, generally 0.2-0.6mm. In the dry northwest, north and northeast China, between the floor general nature split is the best. When laying floor needs nailing with nail diagonally into the dedicated. Third, the multi-layer wood floor coverings, floor after the acceptance inspection after installation in the floor surface is typically three days should be clean and smooth. Exterior quality in line with relevant product standards.
Patchwork floor boards in adjacent rows long 1/2 or 1/3. Laying on the floor should be firm, not loose, trampling no abnormal noise. After the completion of a multi-layer solid wood floor coverings, after at least 24 hours before use health, otherwise it will affect the results of a multi-layer solid wood flooring. Generally poor water resistance multilayer wood flooring should not use a damp cloth or clean water, so as not to lose their luster. Usually seasonal temperature changes experienced after the test, the floor will be more stable, focusing on routine maintenance can extend life and improve the results. Multi-layer solid wood flooring products to its special structure, itself is on a flat, dry surface directly laid. In particular, almost all northern cities are like the pavement, including with underfloor heating systems on the ground.
Different users have their own spending habits, basically most of them hit the keel, playing the keel when the best encryption to ensure Jiaogan also ensures the force strength, higher than the cost of natural cement screed to. However, the ease flooring experts suggest that you shop the best multi-layer solid wood floor keel. Multi-layer solid wood flooring usually maglev lay laying method. When using this laying method, the multi-layer wood flooring in direct contact with the ground through a cushion, not vacant, so when talent somewhere above it, bending deformation is not obvious. When using the keel laying, there is a certain distance between the keel, when talent is between keel, deflection occurs, so that when the elastic modulus of the multi-layer wood flooring it and bending strength is too small, there will be foot feeling soft Feeling. So, in order to ensure a comfortable foot feeling, multi-layer solid wood flooring needs keel laying.